Design: Janne Saario
Build: 2019
The park is designed into 3 sections that flow together seamlessly. The entrance section utilizes 2,500 sq ft. of the first wood skatepark slab but with all new flat ground features flanked with a new bank to cub and quarter pipe. The middle section is mixed transition and street with features that include a rainbow rail/quarter, kong wall, jumps, bank to rails, hubbas and ledges with 3 elevation changes. The third section is a long ditch-like bowl with 2 mini’s of different heights, extension, and a large transfer into a transition hip area that flows riders back into the other 2 sections of the park.
Build Pics!
3 Comments
so glad you’re building a (much needed) new skatepark in columbus! what is the expected finished date? thank you!
Learned of this via
https://99percentinvisible.org/episode/the-pool-and-the-stream-redux/ what a story!
Joli Crider 2.0 Park project site:
https://www.columbusparkfoundation.org/projects/jolie-crider-memorial-skate-park/
Happy to become a supporter.
I first heard of this skatepark on 99% as well!