Build: Summer 2021

In 2020, the City of Broken Arrow chose ASD to design the new addition with input from local and regional skaters/bikers. The new skatepark is around 16,000 s.f. and the design is street heavy, with a small pump track extension. We are building the park with a local general contractor, Magnum Construction. We’ve added a few sheets of the construction documents below, for those of you that missed the design input sessions and wonder what’s coming: